Lunar Payload Electronics

CASE STUDY

Confidential / Commercial Space Client

CLIENT

INDUSTRY

Space

Partial Requirements and Specifications

WHAT CLIENT PROVIDED

WHAT UU DELIVERED

Custom Electronics Design and Prototyping

Sixteen-week electronics development timeline from project kickoff through verification support.

16-week Timeline

PROJECT OVERVIEW

The UU team helped a confidential commercial space company develop prototype control electronics for equipment designed to explore the lunar surface.

The prototype was created to validate the client’s planned methodology in a laboratory environment before progressing toward flight-ready hardware.

In fewer than 16 weeks, the UU team developed four circuit board assemblies and delivered manufacturing-ready design files. Because of the high cost of landing hardware on the Moon, the system had strict cost and mass constraints. Meeting those requirements demanded thoughtful component selection, efficient architecture decisions, and a detailed mass model to keep the design within the mission’s payload limits.

The final system comprised four interconnected circuit board assemblies, 4,343 components, and boards with up to 14 PCB layers. The completed prototype provided a platform for laboratory testing, risk reduction, and continued development toward a future lunar mission.

Four interconnected circuit board assemblies developed for lunar payload prototype hardware.

PROTOTYPE HARDWARE

The prototype integrated a digital card supporting a commercial single-board computer and command-and-control interface, plus power switching, high-power motor control, and four-axis robotic-arm control.